Install it right, and it lasts
This guide covers all LB Timber engineered flooring, including our European Oak engineered boards. Parquetry (herringbone and chevron) comes with its own instructions.
Read it through before you start. Most flooring problems begin with the site or the subfloor, not the boards.
Documents & Downloads
Engineered
The numbers that matter
Preparing your subfloor
Open the one that matches your floor.
Floating or glue-down
Step by step
Coastal NSW and Qld: rafts up to 6 m wide and 10 m long. Vic, NZ and moderate climates such as Perth: up to 10 m by 12 m.
-
Check the site
Make sure the site and subfloor meet the requirements above.
-
Plan the rafts
A floating floor moves as a whole, so split large or complex floors into rafts joined by control joints, usually H-trims. Put one at every doorway between main rooms.
-
Check the alignment
If a hallway leads into an open area, snap a chalk line down the middle of the hallway and through the open area. Use it to check the walls and balance the boards either side.
-
Lay the underlay
Use a suitable damp-proof underlay. Start along a long outside wall, with the moisture barrier film turned up that wall.
-
Prepare the first row
Cut it narrower from the tongue side if needed, and scribe it to the wall. Remove tongues or ends that would sit against a wall. If trimming removes an end joint's plastic tongue, glue that joint with cross-linked PVA.
-
Set the gap
Put spacers along the board edges and ends: 10 mm in Vic, SA, WA and NZ, 15 mm in NSW and Qld.
-
Lay the first row
Usually left to right, with the groove facing away from the wall. Clean the end grooves before clicking the ends together. Keep the last board at least 300 mm long.
-
Lock in the second row
Stagger the joints at least 300 mm. Angle the tongue into the groove and fold down so the edge and end lock together. Tap gently if needed; it shouldn't need force.
-
Keep going
Start rows with offcuts. Tape each run of underlay to the next. Scribe and cut the last row to the wall, allowing for the gap.
-
Fit the trims
At doorways, external doors, other floor surfaces and between rafts. Fix trims to the subfloor, never to the flooring, and leave room for movement.
-
Leave the edges free
Don't caulk around the edges; it stops the floor moving and can make it buckle. Lay around heavy fixtures such as kitchen benches, never under them.
Step by step
Use a non-etching (isocyanate-free) polyurethane or polymer flooring adhesive. The moisture barrier, levelling compound and adhesive must come from the same maker, or a system the makers have agreed.
-
Check the site
Make sure the site and subfloor meet the requirements above, especially if someone else did the preparation.
-
Plan expansion breaks
Coastal NSW and Qld: add one when the floor is more than 10 m wide or 12 m long. Vic, NZ and Perth: more than 12 m wide or 14 m long. Leave a 5 mm break and fill it with cork or caulk.
-
Check the alignment
Use a chalk line down the hallway, as for floating floors. Starting from a centre line can work better than starting at a wall.
-
Dry-lay the first row
Along a long outside wall. Cut the last board to length (at least 300 mm), leaving the 5 mm gap at both ends. Cut narrower from the tongue side if needed and scribe to the wall.
-
Mark the chalk line
Measure out from the wall the gap plus the first board plus a second board. Mark both ends, snap a chalk line and move the boards aside.
-
Spread the adhesive
Spread a full trowel bed from the chalk line to the wall, with the trowel the adhesive maker specifies held at 45°. Beads of adhesive often leave hollow spots.
-
Lay and lock
Lay the first row with the groove facing away from the wall, pressed into the adhesive. For the next row, angle each board at 45°, line up the end joint and fold down in one movement so it locks.
-
Keep going
Spread adhesive 3 or 4 boards wide along the full row. Don't leave it open more than 35 to 45 minutes (check the maker's instructions). Keep joints at least 300 mm apart and avoid repeating patterns.
-
Check for hollow spots
Don't walk on fresh boards. If you find hollow spots, lift a board to check coverage, then weight or fix boards while the adhesive cures. Clean any adhesive off the surface straight away.